Core Advantages
Instant Switchover
Sub-10ms switchover to battery keeps critical loads running without disruption.
Ride-Through
Smooth ride-through of voltage sags, frequency events and momentary outages.
Planned Outage
Replace noisy diesel gen-sets for planned maintenance and tariff window events.
Power Quality
Active filtering cleans harmonics, surges and voltage flickers for sensitive equipment.
System Architecture
How It Works
The LVK BESS monitors grid quality in real time. The instant a sag or outage is detected, the STS transfers critical loads to battery power within milliseconds — no interruption, no flicker, no reboot.
-
Grid Normal
Critical loads are powered by the grid; the BESS floats charged.
-
Outage Detected
Voltage sag or outage is detected in milliseconds.
-
Seamless Transfer
STS switches loads to the BESS without any interruption.
-
Grid Restored
BESS resynchronizes and recharges when the grid returns.
Value Delivered
- < 10ms Seamless switchover time.
- 99.999% Critical load availability.
- 50%+ Reduce diesel runtime for planned events.
- Quiet Silent operation vs. diesel generator.
Project Cases
Virtual Transformer Capacity Expansion for a Commercial Office Building in Dubai, UAE
Dubai, UAE
Capacity: 1044 kWh
Result: Successfully provided the building with 30% additional usable virtual grid capacity, eliminating the need for costly traditional transformer upgrades.
View Details4MWh Backup Power Project for a Large Downtown Data Center in Accra, Ghana
Accra, Ghana (city center)
Capacity: 4 MWh
Result: Ensured 100% zero downtime and zero data loss for critical server loads at this key West African data center.
View Details1044kWh Solar-plus-Storage Project for a Large Cold Chain Warehouse in Cape Town, South Africa
Cape Town, South Africa (suburbs)
Capacity: 1044 kWh
Result: Reduced the cold chain center's base electricity costs by 52%.
View Details